Leave your details below and we'll send you more information on investing, home buying and the support Alliance Investments can offer you.
Home to 12 luxury townhouses at ground level, as well as 345 one- and two-bedroom apartments, Oxygen sets a new benchmark in 5-star city living; with every apartment and townhouse finished to exceptionally high standards.
Full height windows flood the properties with natural daylight and balconies offer panoramic views over the city and the Peak District National Park beyond. At the heart of the building is a vibrant social hub which offers residents a wealth of luxury leisure amenities featuring a gymnasium, spa and shared outdoor spaces including a garden terrace of stepped allotments on the south corner of the building.
Two-bedroom townhouse, ground floor virtual tour
Two-bedroom apartment, 9th floor, virtual tour
Oxygen is located within an area of Manchester currently undergoing a significant period of transformation. In close proximity to the Mayfield area of the city, and on the doorstep of Ancoats – a neighbourhood voted as one of the most cosmopolitan in the world – Oxygen will offer the highest levels of luxury living.
In terms of transport links, Oxygen is unrivalled in its connections. In less than five minutes, residents can be at Piccadilly, Manchester’s main train station and a key hub for the new HS2 high-speed rail link, meaning residents of Oxygen are within commuting distance of the surrounding area, as well as London and Birmingham.
Q3 2020
Work has continued at Oxygen over the past six months and, despite the additional implications of the COVID-19 pandemic, cladding is now being installed to levels 21-27 Tower 1. The cladding of Tower 2 is now complete.
The curtain walling window installation is ongoing in Tower 1 and Tower 2, from levels 16-21 and 10-14 respectively. Internal fit out works are progressing across all three Towers with a total of nine phases now taking place. These include partitioning, 1st fix mechanical and electrical works, and all plastering.
Lift installation is progressing well in Tower 1, and due to the speed of work, we have been able to remove crane three from site.
Next update is due week commencing 21st December 2020.