Downtown
sold out

Manchester’s Premier Residence

with a host of hotel-style services

SOLD
OUT

Estimated Yields

7%

Apartments

368

Bedrooms

1, 2, 3

An energetic community at the gateway to Manchester, providing a spacious range of 368, one, two and three bedroom apartments. Nestled on the banks of the River Irwell, footbridge access provides a direct link to the vibrant centre of Manchester’s booming city within five minutes.

  • 368 luxury apartments
  • 1, 2 & 3 Bedroom
  • SPA – steam room, plunge pools
  • High tech gymnasium
  • Full service concierge
  • Cinema room
  • Business centre
  • 5 minute walk into the city centre
  • 6% rental yields
  • Chill out roof terraces
Development Overview

An energetic community at the gateway to Manchester, providing a spacious range of 368, one, two and three bedroom apartments.

The development will provide the luxury of concierge, a wealth of high grade private realm and communal roof terraces incorporating outdoor kitchens and ‘chill out’ zones. Dried and chilled post rooms ensure you don’t have to be at home to take receipt of goods or perishable food store deliveries as Downtown’s designated concierge will take care of it.

Rapid reactive on site maintenance and coordinated support provides piece of mind for hassle free living and large service lifts ensure moving in is trouble free. Biometric and monitored entry provides a more secure living experience.

Relieve the stresses of a working day in our on site fitness suite, steam room or plunge-pools or relax in our spacious lobby or even enjoy a movie in our state of the art media room.

If working from home is becoming too much, adjourn to our business centre or make use of Downtown’s onsite boardroom and enjoy unrestricted high speed broadband access throughout the property.

Payment Process

Step 1 – Choose an Apartment

Step 2 – Complete Reservation form

Step 3 – £5,000 Reservation fee

Step 4 – 30% on Exchange (Minus £5,000 reservation fee)

Step 5 – 70% on Completion

Construction Updates

PHASE ONE (Blocks D, E, F)

Block D

  • Concrete frame now complete
  • Mechanical & Electrical first fix complete upto level 7
  • Boarding to apartments upto level 9
  • Skimming level 7
  • Second fix joinery has commenced level 7
  • Kitchens installation complete up to level 4
  • Second fix sanitary ware installation complete up to level 2&3
  • Decoration complete up to levels 3
  • Lift installation in progress
  • Vinyl flooring preparation up to level 3

Block E

  • Skimming complete upto level 3
  • Second fix joinery complete upto level 3
  • Kitchens installation complete upto level 2
  • Second fix sanitary ware installation complete upto level 2
  • Decoration levels 2 ongoing
  • Ceramic tiling Preparation up to level 3

Block F

  • Mechanical & Electrical first fix apartments complete upto level 6
  • Boarding to apartments complete upto level 7 – ongoing
  • Plastering level 3 – ongoing.
  • Lift installation – complete.

PHASE TWO (Blocks A, B, C)

  • Concrete frame has now progressed to the 11th
  • Concrete Frame will be completed by December 2018

Next update due WC February 2019

Location Map

Downtown

REGISTER INTEREST

Fill in your information to request brochure, prices and availability.

  • This field is for validation purposes and should be left unchanged.